PBG-Tender

DAFTAR KEGIATAN PENGADAAN BARANG DAN JASA
DINAS PEKERJAAN UMUM DAN TATA RUANG
KABUPATEN SUMENEP
TAHUN ANGGARAN 2022
NO.URAIANLOKASINILAI DPA
(Rp.)
NILAI KONTRAK
(Rp.)
PELAKSANAREALISASI
(Rp.)
PEMBAYARAN
1.Pembangunan Gedung DPRDKec. Kota Sumenep940.548.085938.713.902PT. JAYA SARANA INDAH GROUP764.343.101,13
127.441.749,12
Angs. Bln I
Angs. Bln II
2.Pembangunan Pagar Keliling RSUD ArjasaKec. Arjasa1.579.061.9991.370.647.979,45CV. SASINDO DELTA UTAMA378.898.500
573.069.633,93
350.147.446,55
68.532.398,97
Uang Muka
Angs. Bln I
Angs. Bln II
Angs. Bln III
3.Rehabiltasi Gedung Kantor Kecamatan Batang-BatangKec. Batang-Batang684.275.155647.901.886,01CV. PERMATA JINGGA205.282.546,30
226.546.933,03
183.677.312,38
Uang Muka
Angs. Bln. I
Angs. Bln II
Angs. Bln III
4.Rehabilitasi Gedung Kantor Kecamatan PragaanKec. Pragaan704.823.263700.139.584,85CV. MATA AIR INDAH205.737.511,55
338.092.482,82
121.302.611,24
35.006.979,24
Uang Muka
Angs. Bln. I
Angs. Bln. II
Angs. Bln. III
5.Rehabilitasi Gedung Kantor SapekenKec. Sapeken700.000.000696.914.461,34CV. BUANA EMA RAYA206.022.954,48
147.184.298,95
297.814.921,48
34.264.325
Uang Muka
Angs. Bln. I
Angs. Bln. II
Angs. Bln. III
6.Rehabilitasi Gedung Rawat Inap Penyakit Menular RSUD Dr. H. Moh. Anwar SumenepKec. Kota Sumenep1.831.831.8321.831.382.690,71CV. AO. UTAMA549.549.549,39
606.407.709,54
583.856.297,24
91.569.134,54
Uang Muka
Angs. Bln. I
Angs. Bln. II
Angs. Bln. III
7.Rehabilitasi Kios Pasar LentengKec. Lenteng1.371.304.8451.371.100.222,47CV. MITRA UTAMA403.441.710
448.398.021,20
450.705.480,15
68.555.011,12
Uang Muka
Angs. Bln I
Angs. Bln. II
Angs. Bln. III
8.Rehabiltasi Pendopo Keraton SumenepKec. Kota Sumenep1.365.483.5231.365.483.523CV. MITRA UTAMA405.488.967,11
380.409.221,07
511.311.158,68
Uang Muka
Angs. Bln. I
Angs. Bln. II
Angs. Bln. III
9.Manajemen Konstruksi Pembangunan Gedung DPRDKec. Kota Sumenep2.559.883.6412.332.516.815PT. YODYA KARYA (Persero) Wilayah I349.877.522Uang Muka
10.Pembangunan Gedung Pengemasan Produk UMKM (Ex. Tajamara)Kec. Kota Sumenep802.000.000801.564.000CV. TRI TUNGGAL SAKTI519.032.703,42
242.453.096,58
40.078.200
Angs. Bln I
Angs. Bln. II
Angs. Bln. III
Gulir ke Atas